Are we ready to face rains in Delhi
Sealing process is slow due to less manpower and more opposition from leaders who oppose because opposition has to speak against the ruling party and to please voters
Or people who are involved in illegalities have lots of connections to evade arrest
This building has lots of illegal rooms and toilet
PNG pipeline is passing through all around the common roof
Height of the building is More than 150 meter.
Any building in Delhi having a height more than 150 M is a risk for department of🔥 fire safety
Unfortunately fire safety department doesn't look into illegal structures
It's duty assigned to MCD
MCD is aware
Area police is Made aware
FF has PNG connection
GF and barsaati floor don't have PNG connection because of illegal structures everywhere and no escape route in case of a calamity
These houses are 50+ years old and foundation hasn't been altered to carry excess loads added to them
Plots are 208M only in the lanes
If there's a calamity like fire, entire row of buildings and fancy cars Will become Ash, besides loss of human lives
If authorities are reading this,do take some action as a deterrent for others
Let illegal structures not become a Norm
Writing letters to relevant authorities online and meeting SDM personally, explaining with proofs like MCD approved maps and completion certificate,may show some results
Afterall in metros We are living with hope and survival instinct more
After I met SDM ,2 years ago,nobody has visited my flat.
Cracks & Illegal Structures are Visible to Everyone.
I wrote to Fire Safety,online
I got a reply that illegal structures are not covered by fire safety.
It is duty of MCD & this online reply from Fire Safety was directed to MCD
Last resort for me is to fight a Court Case,which I Cannot do,because the opponents are well connected
Thanks for your kind words.
Tweeted to-Kejriwal & Modi with pictures as proof & both claim to be sensitive for Safety of Girls & Women!
Regards. more