Hi, An over view of our ZERO WASTE, HYGIENIC & ENVIRONMENT FRIENDLY TECHNOLOGY:(Detailed document attached) 1. Waste Management: We have developed a microbiological process for treating waste. The foul odour goes away within two to three hrs of treatment. There are no flies of insects on it. Our proprietary culture raises the temperature to 80deg inside the windrows of waste. This high temp. dries the waste. It is a 10 to 12 day cycle. This hygienic waste is then sorted by manual and automatic processes- processed, shredded and then briquetted to be a feedstock for our advanced Gasification system. 2. Gasification : Briquettes produced as per above are a feedstock for our Gasification system. We manufacture 90% efficient, Multi-fuel Gasification systems in SS304grade with technological excellence with highest quality of ultra-clean Producer/Syn-gas having a calorific value of >2200Kcals/cu.mt., ever produced anywhere. Coal, Biomass, Agri-waste, kitchen waste, Plastics, Polythenes, paper, rags, leather waste, rubber waste, hazardous waste etc are all Gasifiable in our manufactured Gasification system with toxins viz. Dioxins, Furans, NOx, SOx, H2S, etc. in traces. The test reports from SGS test lab and Bureau Veritas test lab will ratify our claims. The highest capacity of a single unit, which can be easily shipped/transported due to its voluminous size is of 4MW. 3. Power Generation: A Generator, modified by our expertise for Producer Gas mode of operation is also available for demonstration. We prefer MTU (Rolls Royce-Chrysler Daimler) Gen-sets. The highest capacity as a single unit is 1.56MW. 4. There are No Effluents, i.e. no drainage of water from our Gasification system or Power Generation. Tar is received as a byproduct and Compost is a byproduct from our waste management. Ash is the only waste and is a good raw material for PCC blocks. This project has the potential to generate thousands of jobs. A mere 350 tons per day waste project would generate close to 9MW per hr. of electricity & provide employment to an estimated 150 people. We are technocrats and can do EPC on a turnkey basis. My email: rajiv.mohan@fuelpowertechnologies.com, mob.:9761968622
more