“INDIAN RAILWAYS ON TIME”
1. Remove SLR (Luggage van) from the train, this often leads to unnecessary delay because of unloading and offloading beyond stipulated time. It has been observed that on several occasion, either the porters or contractors does not stick to the time limit consequently the train get delayed. Moreover, the incoming train on the same platform has to wait outside for quite some time before the whole business is over.
2. If need be then run separate dedicated luggage van for transporting goods and materials.
3. We should have strictly zonal control unit for the movement of the train and we should give away this responsibility from the each individual stations passing through that railway corridor.
4. The dossier/ ACR of drivers and guards should be on the basis of their attitudes towards running the train on time.
5. Introduction of advance and automatic signaling system, this will eliminate human error
6. Making changes in scheduled of arrival and departure of the trains on the basis of least conflict in timing with other important trains.
7. All the stakeholders of Indian railways should be sensitized about this critical issue and let us dedicate one year of rail as “INDIAN RAILWAYS ON TIME” more