Malpractice in I.R.
For quite some time level crossing No.2 in Sealdah-Barrackpur-Ranghat Section I find Down line road top is not properly settled. It may cause a major accident as from railway line and floor a long height exists which causes hurdles while two wheeler, rickshaws and other light vehicles carries materials and rider. A few days back the whole pavement of the crossing was metalled with proper bitumen. Why this happen again and why the situation is prevailing only wait for an emergency to occur and loss of life do occur.
AK GHOSH more