Power supply situation in Gurgaon
* The overhead lines are in a weak state and small amount of rain or wind results in a breakdown.
The strengthening of the lines(particularly, the 11KV lines) can be done at minimal cost and third party can be given the contract for the same.
Even the local MLA's can be asked to share the cost from their budget.
* The system of centralized call center is not effective as it is faceless and there is considerable delay till the complaint reaches the linemen.
* The local JE's name/mobile no. should be available for public to contact directly. more