Rain water & Drainage works and the corruption
They made concrete tunnels with tiny holes in 25-30 feet apart . On top of that they put expensive Inter lock bricks as a foot path. Now they are redoing the whole process after demolishing the old drains and removing the muck and mud in the drains. The only difference now, is that the drain holes are bigger. It is again a waste of money and a scam.
1. We need a proper drainage to remove the dirt periodically from any part of water block.
2. Drains should be covered with proper precast concrete slabs of proper weight, so that it will be easy to handle when needed.
3. Instead of expensive interlock bricks, the slabs can be made with colour coating or designs.
4. Our roads and surroundings are muddy and dusty and in due course it fill the drains. Especially in rainy season.
5. The holes provided have only 30% use, because no human can reach the mud in the middle of man holes.
6. I have also noticed that the concrete work (ready-Mix ) done is wrong. The iron frame work is kept close to wooden plank and the concrete layer is spread over it. The iron is not covered fully with concrete and half of it is exposed to air and water below and it will get rusty and break within 1-2 years. To avoid public view they do this at night.
I feel it is purely a money making process for the contractors and the BMC staff. more