Unscientific road laying ,lack of foot paths-why?
The gradient in which it was there before has to be maintained ,by scaping the damaged and old road ,then relayed it in the same gradient .
But the GHMC contractors have been laying over the old road thus increasing the height every time .As such in five to ten years the roads have gained a height up to about 1-3 feet .The absence of storm water drains has added to this , presently during rainy season whenthe rain is heavy the water is flowing on to the sides thus entering many shops and houses which are in lower area before new road laying.
There fore GHMC must take this factor in to consideration and help inprevention of flooding during heavy rains.
The lack of foot paths is leading to pedestrians using the edge of roads ,causing sprains,injuries,accidents as the traffic heavy areas are sparing none in the rush times.Old people ,sick people ,people with deformities are prone to accidents by two three and four wheelers Can’t the GHMC include the road laying and foot path building simultaneously in the same contract along with storm water drains beside the roads?.
We at Radhika theatre -Dammaiguda road which is a highway are scared to death by this apathy ,added to this roadsides are occupied by push carts ,wine shop parking and hotel parking and other vehicular parking .
The GHMC Kapra authorities must re-examine this policy and act . more