What's needed for Zero Accident Mission - Addl Inputs

1. Frequent checking of train tracks for its safe & reliable use
• Proper checking methodology - Standard check points list to be developed so that even single small point will not missed out
• Component aging limit needs to be fixed for engine, coach, signaling system, controlling system, tracks – if needed it is to be upgraded or replaced with new one.
• proper training to employees
• Train track checking frequency to be fixed – it is to be followed vigorously & seriously
• If any defects are observed while checking then what immediate actions needs to be taken by track checking team and railway management needs to be fixed.
2. Our railway tracks are very busy so probability of improper checking of tracks / railway lines
• needs to think for additional tracks
• At many locations double tracks are not available and available single track will face heavy traffic – study to be carried out to know the traffic load
3. Unmanned crossing needs to be closed with suitable gate along with gate keeper. Even on gate both side minor opening and opening at bottom part of gate needs to be closed - Many time it has been observed public using this opening for early escape.
4. Position wise responsibility needs to be fixed and training should be specific to responsibility. Training contents should be
• Roles and responsibility along with minor and major steps to be followed
• Importance of specific positions
• How further improvement can be observed for particular position
• What will be the end result of minor mistakes?
• Accident scenarios in totality indicating
 Numbers causality
 Different type of accident observed till date
 Reason of accident and how it can be avoided.
 Controlling Factors, How it can be avoided – how employees can contribute for avoiding accidents.
• How employee can contribute for more effectiveness
• Overall Performance of unit
5. Training to employees who are involved in train rout monitoring, tracking and track controlling – role specific training
6. Increments and promotions on performance based only
7. Incentive schemes to get more output from employees.
8. Ownership concept to be implanted – presently no one owns ownership due to which railway property is not taken care more  

Post a Comment

Related Posts

    • IRCTC is horrible even in age of AI

      IRCTC Website is Horrible and Most of The Time Times Don’t Work Properly During Tatkal Also, Don’t forget to Tick on ‘Book Only If Confirm Births Are Allott...

      By Dipali Yadav
      /
    • HAPPLESS LEGITIMATE TICKET HOLDERS MISS TRAIN -AGRESSIVE ILLEGITIMATE PASSENGERS THE CULPRITS :

      *Even as the rakes were rolling into the platform, the berths were occupied compartment full. Attached picture will show - Conniving with the Yard staff and touts ? - Resulting in passengers hol...

      By Jayakumar Daniel
      /
    • Vande Bharat highjacked by ticketless

      Passengers in Lucknow. Where is RPF or Railway Police

      By Sujata Singh
      /
    • Senior citizens concession

      It's long awaited demand of sr.ctzns to continue again their concession as it was before corona wave. In recent election, we have seen that I.N.D.I. Alliance promise to give 1 lac to each...

      By Satyapal Singh
      /
    • Fire the railways minister

      He is the most hopeless of all times. See attached. Other than launching new trains and modernising stations he is a failure in running existing operations and delivering any service

      By Vijaya Nair
      /
    • Wait listed tickets

      IR is earning hundred of crores from cancellation of wait listed tickets. When govt knows accomodAtion capacity of coach, Total RAC is not confirmed even, Summer Vacation season, wedding seas...

      By Satyapal Singh
      /
    • Trains now completely ruined

      Trains are completely ruined. 2AC also not spared. People forcing themselves in, fighting with confirmed ticket holders to share their seats, Horrible. Where is the Railways Minister. LC...

      By SN Mittal
      /
    • REFUND RULES

      WHY NO REFUND CAN BE CLAIMED FOR MISSED TRAIN , WE CANNOT FILE TDR OR CLAIM ANY REFUND IF WE MISS A TRAIN FOR ANY REASON AS RULE SAYS TO FILE BEFORE 24 HOURS , OR EVEN FOR DELAYED TRAIN FOR MORE TH...

      By Sona Shah
      /
    • रेलवेज़ हमे लूट रही

      क्या आप जानते हैं कि, अगर आपने IRCTC के वेबसाईट से वेटिंग टिकट बुक किया और वो कंफर्म नहीं हुआ तो खुद रेलवे खुद उस टिकट को कैंसिल कर देती है एवं आप द्वारा भुगतान किए गये राशि का एक बड़ा हिस्सा ...

      By Ajay Kumar
      /
    • No direct trains

      There are some business centers,even now, which are not connected by direct trains. MORADABAD , known as PEETAL CITY, a big business center, in western Uttar Pradesh, is not having even direct...

      By Satyapal Singh
      /
    • Newly introduced trains boast a pristine appearance, offering posh interiors, comfortable seating,

      , and swift travel. However, the inadequacy of trains during festive and holiday periods remains a pressing issue. Among those most affected are the guest workers, migrant laborers traveling long d...

      By Jayakumar Daniel
      /
Share
Enter your email and mobile number and we will send you the instructions

Note - The email can sometime gets delivered to the spam folder, so the instruction will be send to your mobile as well

All My Circles
Invite to
(Maximum 500 email ids allowed.)