On visit ,Anybody can see about the working of UPPVVN in Allahabad, like over billing by meter reader through metering without inspection, still meter installed inside the covered premises in posh colonies while UP Electricity Regulatory Commission directly told in para 4/15a about point of supply that ,Supply shall be given at a single point, in premises, at the outgoing terminal of the Licensee. The Licensee shall determine the point of supply such that the meters and other equipment are always accessible to the Licensee without obstruction for inspection, for possible steal electricity ,those areas are like preetamnagar, Chufatka, rajapur, Kareli etc vide BAmrauli, Myohall or Kalyani devi electric blocks. Also ,You would be surprised that about 40-60 percent of electricity is unbilled due to the cowardliness/cleverness of the department because several areas are likely un billed as Mariadeeh , kasari masari, karelabag, bamrauli gaon, gaddopur, rajapur(nichwagadhi) and sulem sarai(nehru park), along with all homes on najul land where either they used by hook-kantia or with najrana with JE/AE/linemen/meter reader. All these unbilled or unrecoverable electricity are used to announced and booked in LINE LOSS while it's major part are gone to their pocket as bribe.
Today, electricity board want to hike rate about 20% , this would be crucial for the genuine consumer, because you should fix line loss and stealing and made stealing through officials and staff, first.
Hope, to see positively .
Thanks !
more